参考文献/References:
[1] ChenRP,ZhuJ,LiuW,etal.GroundmovementinducedbyparallelEPBtunnelsinsiltysoils[J].TunnellingandUn-dergroundSpaceTechnology,2011,26(1):163-171.[2] MairRJ,TaylorRN,BracegirdleA.Subsurfacesettlementprofilesabovetunnelsinclays[J].Geotechnique,1993,43(2):361-362.
[3] PeckRB.Deepexcavationsandtunnelinginsoftground[C]//Proceedingsofthe7thInternationalConferenceonSoilMechanicsandFoundationEngineering.MexicoCity,1969:225-290.
[4] SagasetaC.Analysisofundrainedsoildeformationduetogroundloss[J].Geotechnique,1987,37(3):301-320.
[5] 魏纲.盾构法隧道施工引起的土体变形预测[J].岩石力学与工程学报,2009,28(2):418-424.
[6] 陈春来,赵城丽,魏纲,等.基于Peck公式的双线盾构引起的土体沉降预测[J].岩土力学,2014,35(8):2212-2218.
[7] 刘建航,侯学渊.盾构法隧道[M].北京:中国铁道出版社,1991.
[8] 刘波,陶龙光,丁城刚,等.地铁双隧道施工诱发地表沉降预测研究与应用[J].中国矿业大学学报,2006,35(3):356-361.
[9] 张志强,黄朱林,韩飞.非对称小净距隧道施工力学特性研究及方案优化[J].现代隧道技术,2007,44(6):22-26.
[10] 李鹏飞,王帆,聂雄,等.深埋非对称连拱隧道围岩压力计算方法研究[J].岩土工程学报,2016,38(9):1625-1629.
[11] 唐志扬.沈阳地铁9号线吉汪段区间隧道施工稳定性研究及支护结构监测分析[D].沈阳:东北大学,2014.
[12] 施成华,彭立敏,刘宝琛.盾构法施工隧道纵向地层移动与变形预计[J].岩土工程学报,2003,25(5):585-589.
[13] 张治国,白乔木,赵其华.带衬砌浅埋隧道开挖受非对称收敛变形影响的地层位移和衬砌应力分析[J].岩石力学与工程学报,2016,35(6):1202-1213.
[14] 王剑晨,张顶立,张成平,等.北京地区浅埋暗挖法下穿施工既有隧道变形特点及预测[J].岩石力学与工程学报,2014,33(5):947-956.
[15] WeiGang.Predictionofsoilsettlementcausedbydouble-lineparallelshieldtunnelconstruction[J].DisasterAd-vances,2013,6(6):23-27.
[16] 韩煊,李宁,StandingJR.Peck公式在我国隧道施工地面变形预测中的适用性分析[J].岩土力学,2007,28(1):23-28,35.
[17] PeckRB.DeepExcavationandTunnelinginSoftGround[M].NewYork:PublishedbyASCE,1984.
[18] SakuraiS.Lessonslearnedfromfieldmeasurementintun-neling[J].TunnellingandUndergroundSpaceTechoNolo-gy,1997,12(4):453-460.
[19] Carranza-TorresC,FairhurstC.Onthestabilityoftunnelsundergravityloading,withpost-peaksofteningoftheground[J].InternationalJournalofRockMechanicsandMiningSciences&GeomechanicsAbstracts,1997,34(3/4):585.
[20] WenD,PohJ,NgYW.Designconsiderationsforboredtunnelsatcloseproximity[J].TunnelingandUndergroundSpaceTechnology,2004,19(4/5):468-469.
[21] MrouehH,ShahrourI.Afull3-Dfiniteelementanalysisoftunneling-adjacentstructuresinteraction[J].ComputersandGeotechnics,2003,30(3):245-253.
[22] KimuraH,ItohT,IwataM,etal.Applicationofnewur-bantunnelingmethodinBaikohtunnelexcavation[J].Tun-nelingandUndergroundSpaceTechnology,2005,20(2):151-158.
[23] PerriG.AnalysisoftheeffectsofthetwonewtwintunnelsexcavationveryclosetoabigdiametertunnelofCaracas,subway[J].InternationalJournalofRockMechanicsandMiningSciences&GeomechanicsAbstracts,1995,32(3):138A10.
[24] RicePM.Designandconstructionofwashingtonparksta-tion,westsidelightrailproject,portland,oregon[J].InternationalJournalofRockMechanicsandMiningSciences&GeomechanicsAbstracts,1997,34(3/4):589.
[25] 朱洪高,郑宜枫,陈昊.双圆盾构隧道土体地表沉降特性[J].建筑科学与工程学报,2006,23(2):62-67.
[26] 郝小红,郭佳.考虑超大断面顶管施工过程的地层变形数值分析[J].华北水利水电大学学报(自然科学版),2017,38(6):66-71,81.
相似文献/References:
[1]朱有奇,周云东,赵元海,等.非对称深基坑变形规律现场监测[J].水利与建筑工程学报,2013,(06):157.
[2]顾洋,侯哲生,韩吉珅.营尔岭隧道浅埋段连续坍塌原因分析及预防[J].水利与建筑工程学报,2017,(03):153.[doi:10.3969/j.issn.1672-1144.2017.03.031]
[3]郑广顺,崔帅帅,陈鲁川.浅埋大跨小净距公路隧道施工方法比选及变形控制研究[J].水利与建筑工程学报,2019,(01):227.[doi:10.3969/j.issn.1672-1144.2019.01.041]
[4]李志军.非对称连续施工对已运营车站的变形影响分析[J].水利与建筑工程学报,2021,(03):234.[doi:10.3969/j.issn.1672-1144.2021.03.036]
[5]孙军平,贺海龙,谢秉鑫.浅埋软弱围岩输水隧洞施工工法比较分析[J].水利与建筑工程学报,2023,(05):131.[doi:10.3969/j.issn.1672-1144.2023.05.019]