参考文献/References:
[1] SeedHB,BookerJR.Stabilizationofpotentiallyliquefiable
sanddepositsusinggraveldrains[J].ASCE,1977,103
(GT7):757768.
[2] YamamotoY,HyodoM,OrenseRP,etal.Liquefactionre
sistanceofsandysoilsunderpartiallydrainedcondition[J].
JournalofGeotechnicalandGeoenvironmentalEngineering,
2009,135(8):10321043.
[3] BoulangerRW,IdrissIM,StewartDP,etal.Drainage
capacityofstonecolumnsorgraveldrainsformitigatinglique
faction[C]//GeotechnicalEarthquakeEngineeringandSoil
DynamicsⅢ,ASCE,1998:678690.
[4] MitchellJK.Mitigationofliquefactionpotentialofsiltysands
[C]//FromResearchtoPracticeinGeotechnicalEngineer
ing,ASCE,2008:433451.
[5] BaezJI.Adesignmodelforthereductionofsoilliquefaction
byvibrostonecolumns[D].LosAngeles,CA:Universityof
SouthernCalifornia,1995:1205.
[6] BaezJI,MartinG.Permeabilityandshearwavevelocityof
vibroreplacementstonecolumns[C]//SoilImprovementfor
EarthquakeHazardMitigation,ASCE,1995:6681.
[7] BaezJI,MartinGR.Quantitativeevaluationofstonecol
umntechniquesforearthquakeliquefactionmitigation[C]//
EarthquakeEngineering-10thWorldCon,1992,(3):1477
1483.
[8] IaiS,KoizumiK.Estimationofearthquakeinducedexcess
porewaterpressureforgraveldrains[C]//Proc.7thJapan
EarthquakeEngineeringSymposium,1986:679684.
[9] 徐志英.用砾石排水桩抗地震液化的砂基孔压计算
[J].地震工程与工程振动,1992,12(4):8892.
[10] 杨扣红.一种砂土—碎石桩复合地基新孔压增长模式
及其应用[J].岩土工程界,2008,11(6):2427.
[11] 张旭东,张艳美.考虑井阻的碎石桩复合地基中超孔
压长消的解析解[J].西部探矿工程,2008,20(2):12.
[12] 黄春霞,肖向军,隋志龙.碎石桩复合地基抗液化设计
方法[J].路基工程,2009,(1):2830.
[13] 卿忠先,蒋祖浩.振冲碎石桩用于砂基抗液化处理
[J].西部探矿工程,2003,15(3):2729.
[14] CarrilloN.Simpletwoandthreedimensionalcasesinthe
theoryofconsolidationofsoils[J].JournalofMathematics
andPhysics,1942,21(1):15.
[15] BarronRA.Consolidationoffinegrainedsoilsbydrain
wells[J].Trans.ASCE,1948,(113):103108