参考文献/References:
[1] 张金凯,李守义,吴忠明,等.考虑昼夜温差的碾压混凝土坝温度场仿真分析[J].西安理工大学学报,2008,24(3):311-315.
[2] 王毅鸣,苏 岩,邓毅国.天花板水电站拱坝建基面选择及优化调整研究[J].水力发电,2011,37(6):9-12.
[3] 闫超君,孙林松.基于应变能与模糊贴近度的拱坝体形稳健优化设计[J].水利与建筑工程学报,2016,14(5):37-40.
[4] 朱伯芳,高季章,陈祖煜,等.拱坝设计与研究[M].北京:中国水利水电出版社,2002:156-198.
[5] 张晓飞,李守义,陈尧隆.碾压混凝土拱坝温度场计算的浮动网格法[J].土木工程学报,2006,39(2):126-129.
[6] LiShouyi,RenJinke,WuZhongming,etal.Simulationoftemperaturefield-RCCarchdam[J].InternationalWaterPowerandDamConstruction,2008,60(4):16-18.
[7] LiShouyi,ZhangJinkai,WangTing.EffectofPouringTemperatureonTemperatureStressofRCCGravityDam[C]//GuoMaozu,ZhaoLiang,WangLipo.FourthIn-ternationalConference on NaturalComputation ICNC2008.Piscataway,NJ08855-1331,UnitedStates:Insti-tuteofElectricalandElectronicsEngineersComputerSo-ciety,2008:355-359.
[8] RenJinke,LiShouyi,ZhaoLijuan,etal.ResearchontheeffectofcoolingpipeofRCCgravitydam[J].DamEngineering,2008,19(1):29-38.
[9] ZhangXiaofei,LiShouyi,ChenYaolong.OptimizationofgeometricshapeofXiamenarchdam[J].AdvancesinEngineeringSoftware,2009,40(2):105-109.
[10] ChenYaolong,WangChangjiang,LiShouyi.SimulationanalysisofthermalstressofRCCdamsusing3-Dfiniteelementrelocatingmeshmethod[J].Advancesinengi-neeringsoftware,2001,32(9):677-682.
[11] LiShouyi,ChenYaolong,LiJiuhong,etal.ThenewmethodofarchdamstresscalculationandtheapplicationofGTSTRUDLCAE/CADsystem[J].AdvancesinEngi-neeringSoftware,2000,31(4):303-307.