参考文献/References:
[1] PeckRB.Deepexcavationsandtunnellinginsoftground [C]//Proceedingsofthe7thICSMFEMexico,1969: 311-375.
[2] AttewellPB,YeatesJ,SelbyAR.Soilmovementsin- ducedbytunnellingandtheireffectsonpipelinesand structures[J].MethuenIncNewYorkNy,1986.
[3] RankinW J.Groundmovementsresultingfrom urban tunnelling:Predictionsandeffects[J].GeologicalSocie- tyLondonEngineeringSpecialPublication,1988,5(1): 79-92.
[4] 李 娴,王思瑶,张 标,等.双孔隧道的地表沉降预 测及其可靠度分析[J].地下空间与工程学报,2019, 15(S1):428-435.
[5] 赵胤翔,赵金昌,郭治铁,等.富水粉细砂地层盾构施 工引起地表沉降研究 [J].地下空间与工程学报, 2020,16(S2):918-924.
[6] SagasetaC.Analysisofundrainedsoildeformationdueto groundloss[J].Geotechnique,1987,37(3):301-320.
[7] SagasetaC.Author’sreplytoshieldtunnel[J].Geotee- hnique,1988,38(4):647-649.
[8] VerruijtA,BookerJR.Surfacesettlementsduetode- formationofatunnelinanelastichalfplane[J]. Geotechnique,1996,46(4):753-756.
[9] LoganathanN.Analyticalpredictionfortunneling-in- duced ground movementin clays [J]. Journalof GeotechnicalandGeoenvironmentalEngineering,1998, 124(9):846-856.
[10] 魏 纲,张世民,齐静静,等.盾构隧道施工引起的地 面变形计算方法研究[J].岩石力学与工程学报, 2006,25(S1):3317-3323.
[11] 王泽洋,赵玉成,杨 茜,等.盾构隧道不均匀沉降原 因分析及应对措施研究[J].水利与建筑工程学报, 2019,17(4):53-58,87.
[12] 林存刚.泥水盾构下穿引起上覆砌体结构响应的实 测分析[J].水利与建筑工程学报,2018,16(2):121- 125.
[13] 黄德中,马险峰,王俊淞,等.软土地区盾构上穿越既 有隧道的离心模拟研究[J].岩土工程学报,2012,34 (3):520-527.
[14] 杨兵明,刘保国.地铁列车循环荷载下软土地区盾构 隧道长期沉降分析[J].中国铁道科学,2016,37(3): 61-67.
[15] MengFY,ChenRP,KangX.Effectsoftunneling-in- ducedsoildisturbanceonthepost-constructionsettle- mentinstructuredsoftsoils[J].Tunnelling& Under- groundSpaceTechnology,2018,80(OCT.):53-63.
[16] 李 崴,王者超,李术才,等.哈尔滨地铁粉质黏土力 学性质与超前支护方式研究[J].山东大学学报(工 学版),2018,48(2):61-71.
[17] Rajinder,Bhasin,Eystein,etal.Theuseofstress- strengthrelationshipsintheassessmentoftunnelstabili- ty[J].TunnellingandUndergroundSpaceTechnology, 1996,11(1):93-98.
[18] 钟桂彤.铁路隧道[M].北京:中国铁道出版社,1981.
[19] 魏 纲.盾构法隧道施工引起的土体变形预测[J]. 岩石力学与工程学报,2009,28(2):418-424.
[20] 魏 纲.盾构法隧道施工引起的土体变形三维解 [C]//中国岩石力学与工程学会工程安全与防护分 会:中国岩石力学与工程学会,2010:6.
[21] ZhangDM,HuangHW.Analysisforadditionalstress ofsurroundingsoilduetothedrivingofshieldtunnel [J].UndergroundSpace,1999,19(5):379-382.
[22] LiaoSM,YuY,PengFL.Numericalanalysisof shieldtunnelingconstructionthroughadjacentobjects [J].RockandSoilMechanics,2004,25(S2):223- 226.
[23] WeiG,ZhangSM,QiJJ,et.al.Studyoncalculation methodofgrounddeformationinducedbyshieldtunnel construction[J].ChineseJournalofRockMechanics andEngineering,2006,25(S1):3317-3323.
[24] 姜安龙.盾构隧道施工地层变形三维解及影响因素 分析[J].现代隧道技术,2015,52(1):127-135,142.
[25] 土工的试验方法标准:GB/T50123—2019[S].北京: 中国计划出版社,2019.
[26] 卢廷浩.土力学[M].北京:高等教育出版社,2010: 38-54.
相似文献/References:
[1]李世平,张珂,程龙.基于ABAQUS软件研究载体桩在焦作某工程应用[J].水利与建筑工程学报,2018,(01):28.[doi:10.3969/j.issn.1672-1144.2018.01.006]
[2]杨均,阮永芬,陈赵慧,等.基于云模型评价盾构施工安全等级[J].水利与建筑工程学报,2019,(03):150.[doi:10.3969/j.issn.1672-1144.2019.03.026]
[3]苏岩,刘彪,王正中,等.引汉济渭二期工程输水隧洞盾构开挖过程参数化数值模拟方法研究[J].水利与建筑工程学报,2022,(04):14.[doi:10.3969/j.issn.1672-1144.2022.04.003]
[4]赵玮,张静,王瑜,等.宝鸡峡引水隧洞下穿既有铁路线控制措施研究[J].水利与建筑工程学报,2024,(06):1.[doi:10.3969/j.issn.1672-1144.2024.06.001]
[5]郭浩天,孙庆林,苑成旺,等.基于 HS与 HSS模型的深基坑支护结构变形与受力数值模拟分析[J].水利与建筑工程学报,2025,(01):71.[doi:10.3969/j.issn.1672-1144.2025.01.010]