参考文献/References:
[1] Rocha M. A quantitative method for the interpretation of the results of the observation of dams. VI Congress on Large dams[R]. Report on Question 21, New York,1958.
[2] 吴中如.水工建筑物安全监控理论及其应用[M].北京:高等教育出版社,2003.
[3] Bonelli S, Royet P. Delayed response analysis of dam monitoring data. In: ICOLD European Symposium,Lisse,2001:91-99.
[4] Kim Y S, Kim B T. Prediction of relative crest settlement of concrete-faced rockfill dams analyzed using an artificial neural network model[J]. Computers and Geotechnics,2008,35:313-322.
[5] 虞鸿,吴中如,包腾飞,等.基于主成分的大坝观测数据多效应量统计分析研究[J].中国科学(技术科学),2010,53:1088-1097.
[6] Behrouz A N. Multivariate statistical analysis of monitoring data for concrete dams[D]. Canada Montreal: McGill University,2002:97-102.
[7] Loh C H, Weng J H, Chen C H, et al. Feature extraction within the Fei-Tsui Arch Dam under environmental variations[J]. Nonlinear Stochastic Dynamics & Control, IUTAM BOOK SERIES,2011,29:45-54.
[8] Deraemaeker A, Reynders E, De Roeck G, et al. Vibration-based structural health monitoring using output-only measurements under changing environment[J]. Mechanical Systems and Signal Processing,2008,22:34-56.
[9] Matrtin E B, Morris A J. Non-parametric confidence bounds for process performance monitoring charts[J]. Statistic process control charts,1996,6(6):349-358.
[10] Miller P, Swanson R E, Heckler C F. Contribution plots: A missing link in multivariate quality control[J]. Applied Mathematics and Computer Science,1998,8(4):775-792.