参考文献/References:
[1] Yoo C. Finite-element analysis of tunnel face reinforced by longitudinal pipes[J]. Computers and Geotechnics,2002,29(1):73-94.
[2] Peila D, Oreste P P, Rabajoli G, et al. The pretunnel method, a new Italian technology for full-face tunnel excavation: a numerical approach to design[J]. Tunnel Underground Space Technology,1995,10(3):367-374.
[3] Chambon P, Corté J F. Shallow tunnels in cohesionless soil: stability of tunnel face[J]. Journal of Geotechnical Engineering,1994,120(7):1148-1165.
[4] Lee K M, Rowe R K. Finite element modeling of the three-dimensional ground deformations due to tunneling in soft cohesive soils[J]. Computers and Geotechnics,1990,10(2):87-109.
[5] 梅志荣,陈涛.高速铁路隧道全断面预加固技术的应用研究[J].隧道建设,2008,28(5):542-547.
[6] 陈涛,梅志荣.隧道易切削锚杆全断面预加固的三维数值模拟[J].现代隧道技术,2008,45(5):22-27.
[7] 陈涛,梅志荣,李传富.隧道玻璃纤维锚杆全断面预加固技术的应用研究[C]//中国土木工程学会第十三届年会暨隧道及地下工程分会第十五届年会论文集.北京:同济大学出版社,2008:226-231.
[8] 吉小明,石明霞.浅埋暗挖隧道围岩预加固机理及稳定性分析[J].现代隧道技术,2008,(S1):238-243.
[9] 陶龙光,侯公羽.超前锚杆预支护机理的力学模型研究[J].岩石力学与工程学报,1996,15(3):242-249.
[10] 旷文涛.超前预加固大断面隧道围岩稳定性影响因素研究[D].重庆:西南交通大学,2010:246-247.
[11] 原国家冶金工业局.GB50086—2001.锚杆喷射混凝土支护技术规范[S].北京:中国计划出版社,2001.
[12] 重庆交通科研设计院.JTGD70-2004.公路隧道设计规范[S].北京:人民交通出版社,2004.
[13] 中华人民共和国建设部,中华人民共和国质量监督检验检疫总局.GB50086-2001.锚杆喷射混凝土支护技术规范[S].北京:国家计划出版社,2001.