参考文献/References:
[1] 龙晓鸿,李黎.基于ANSYS的LRB性能模拟验证分析[J].工程抗震与加固,2007,29(4):53-56.
[2] Farazad Naeim, James M Kelly. Design of Seismic Isolation Srtuctures: From Theory to Practice[M]. Newyork: John Wiley & Sons,1999.
[3] Skinner R I, Robinson W H, Meverry G H. An Introduction to seismic Isolation[M].谢礼立,周雍年,赵兴权,译.北京:地震出版社,1996.
[4] Wen Y K. Method for random vibration of hysteretic systems analysis[J]. Engng Mech ASCE,1976,102:249-263.
[5] 肖明葵,刘纲,白绍良.滞回恢复力模型中求折点的一种方法[J].重庆大学学报,2002,25(1):13-16.
[6] 叶昆,李黎,龙晓鸿.LRB基础隔震结构非线性动力响应的非迭代时程计算方法[J].振动与冲击,2008,27(11):46-50.
[7] Tan R Y, Huang M C. System identification of a bridge with lead-rubber bearings[J]. Computers & structures,2000.74(3):267-280.
[8] 谭平,周云,周福霖.大底盘多塔楼结构的混合隔震控制[J].世界地震工程,2007,23(2):12-19.